ANALYSIS RESULT
CORRECTIONS REQUIRED
Your logbook has pending warnings. Review them before submitting — they can make the difference. Candidate: Test User
Total Experience
Missing 4 months to reach the minimum required
Part-66.A.30(e) · Requirement: 24 months
months
Recent Experience
Recent experience acredited — 7 months in last 12m · 8 months in years 2–7
AMC 66.A.30(d) · Minimum: 6 months in last 12m + 6 months in years 2–7
months / 12m
ATA Coverage
2 CORE chapters with insufficient coverage
AMC 66.A.20(b) · 7 CORE chapters required for B2
of 7
Signatures & Authorisations
Some entries have supervisor or authorisation data pending completion
Part-66.A.20(a) · AMC 66.B.100
of 94 affected
2
Critical
3
Warnings
2
No issues
ATA
22
No tasks documented in Auto Flight. This is a CORE chapter for B2 — its absence may result in direct rejection of the application.
ATA
45
No tasks documented in Central Maintenance System. This is a CORE chapter for B2 avionics — without it the authority cannot verify system-level maintenance experience.
ATA
23
Only 3 tasks in Communications. Coverage below minimum required for CORE chapters.
SIGN.
Missing signature — 2 of 94 entries affected (2.1%)
Part-66.A.20(a)AUTH.
Missing authorisation number — 2 of 94 entries affected (2.1%)
Part-66.A.20(a) · AMC 66.B.100ATA
34
12 valid entries documented in Navigation. Good CORE coverage.
ATA
24
9 valid entries documented in Electrical Power. Coverage verified correctly.
14/03/2026 · —
28/01/2026 · —
07/11/2025 · P. Harrison
03/09/2025 · R. Watts
Only entries with issues are shown. The remaining 90 entries have no signature problems.
22
Auto Flight
No tasks
23
Communications
3 tasks
24
Electrical Power
9 tasks
27
Flight Controls
6 tasks
31
Indicating / Recording
7 tasks
33
Lights
2 tasks
34
Navigation
12 tasks
45
Central Maint. System
No tasks
77
Engine Indicating
8 tasks
Covered
5
of 9 chapters
Sparse
2
of 9 chapters
No tasks
2
of 9 chapters
Valid months
20
of 29
Recent (12m)
7
months
Sample of entries extracted from the logbook. Showing 8 of 94 entries.
| Nº | Date | ATA | Description | Certifying Staff | Auth. No. | Status |
|---|---|---|---|---|---|---|
| 1 | 12/03/2025 | 34 | GPS receiver functional check per AMM 34-10-00 | J. Collins | ES.B2.0847 | ✓ OK |
| 2 | 21/03/2025 | 24 | AC bus tie relay inspection per AMM 24-22-00 | J. Collins | ES.B2.0847 | ✓ OK |
| 3 | 07/11/2025 | 34 | TCAS antenna check per AMM 34-44-00 | P. Harrison | — | ⚠ Auth |
| 4 | 15/11/2025 | 31 | DFDR system test per AMM 31-31-00 | J. Collins | ES.B2.0847 | ✓ OK |
| 6 | 14/03/2026 | 34 | ILS receiver replacement — LRU swap per AMM 34-31-00 | — | — | ✗ Sign. |
| 11 | 28/01/2026 | 23 | VHF radio fault diagnosis — BITE check per AMM 23-11-00 | — | — | ✗ Sign. |
ACTION PLAN
Priority actions to complete before submission
Entries missing certifying staff signature
2 entries have no signature or authorisation number from certifying staff. Per Part-66.A.20(a) and AMC 66.B.100, each task must be signed by a licenced person. Without it, entries do not count as valid experience.
Affected entries
How to fix
Contact the certifying staff who supervised these tasks and request they add their signature and authorisation number. For EASA the format is XX.66.NNNNNNN (e.g. ES.B2.0847).
Part-66.A.20(a)
Cover missing CORE ATA chapters
ATA 22 (Auto Flight) and ATA 45 (Central Maintenance System) have no documented tasks. These are CORE chapters for B2 — their absence may result in direct rejection of the application by the authority.
How to fix
Search your maintenance history for tasks performed on these systems and document them correctly. If you have no experience in a chapter, prioritise it in your next hangar rotation before submitting.
AMC 66.A.20(b)
Complete minimum experience months
4 more months of documented avionics maintenance are needed to reach the 24-month minimum required for B1.1 → B2 modification without Part-147 course. Continue documenting supervised maintenance activity.
Part-66.A.30(e)
Reduction option: Part-147 course for B1.1 → B2
Your current route (B1.1 → B2 without Part-147) requires 24 months. Completing a Part-147 approved B2 basic course reduces this to 12 months per Part-66 Appendix IV. This may be more efficient than accumulating the additional months.
Part-66 Appendix IV
This analysis is generated automatically by ZuluHi. It does not guarantee approval by the authority. zuluhi.com